An aircraft landing gear manufacturer faced a big problem. Their old sensors were slowing production to a crawl.
They needed a better solution. And they found it with Dabey Sensor’s MPTW100.
Existing Procurement Pain Points of Original Kulite Parts
A US-based aerospace test lab uses Kulite XCQ-062 for landing gear hydraulic fatigue testing. Though Kulite manufactures all sensors inside New Jersey USA, two core procurement troubles dragged their project timeline constantly:
- Standard factory lead time from Kulite HQ runs 10~12 weeks, priority custom batches get longer production queue amid frequent military & aerospace bulk orders; Minimal-order restriction plus official price markup for
- small-batch R&D orders pushes up recurring test expenditure, emergency spare parts cannot be stocked flexibly.Long waiting period repeatedly delayed their scheduled bench validation progress.
MPTW100 Customized Solution for Landing Gear Test
After sample calibration and side-by-side bench testing, the lab confirmed MPTW100 fully aligns with XCQ-062’s pressure range, accuracy and mounting dimension, enabling direct plug-and-play without fixture rework.
| Item | Dabey MPTW100 | Kulite XCQ‑062 |
|---|---|---|
| Thread | 3/8‑24UNJF / M10×1 | 3/8‑24UNJF / M10×1 |
| Accuracy | 0.1%/0.2%FS BFSL | 0.1%/0.2% FS BFSL(定制) |
| Temp.Range | -55℃~150℃ | -55℃~150℃ |
| Output | mV/4‑20mA/0~5V/0~10V multi-output | Only mV(needs extra signal conditioner) |
| Weight | ≤24.5g | ≈23g |
| Overload/Burst | 2×FS /3×FS | 2×FS /3×FS |
Download MPTW100 Product Manual
Final Project Outcome & Field Verification Data
Full bulk shipment finished within 10 working days, delivering an 85% reduction on overall order cycle. All onsite test readings passed the lab’s aerospace acceptance criteria.Compared with continuous small-quantity spot sourcing from Kulite official channel, this replacement also trimmed their long-term spare-part procurement expense effectively
FAQ
1. Does PWT10 replace Kulite XCQ-062 directly for landing gear test?
Yes, dimension and core performance match for drop-in installation.
2. What is regular bulk lead time of MPTW100?
Standard bulk delivery:4–6 weeks globally.
3. Can we adjust cable/connector specs to fit unique landing gear setup?
Short-run custom modification on wiring and connector is available.
Talk with our engineer for your landing gear sensor customization
